ASL03 - ImprovementsSan Carlos Airport Runway and Connector Taxiways Rehabilitation Project HalfMoonBayAirportRunwayRehabilitationLocationMapHalf Moon Bay Airport Pavement Preservation Project 2665_Higgins2023 Slip-Out Repairs Near 2665 Higgins Canyon Road MMT Construction AreaMidcoast Multi-Modal Trail Improvements Project FOSMD CCTV MapFair Oaks Sewer Maintenance District Sanitary Sewer Lines Cleaning and CCTV Inspection Project Vicinity MapSanitary Sewer Replacement Project in the Fair Oaks Sewer Maintenance District Vine Street Survey - Options 3Reconstruction of Vine Street from Oak Avenue to County/City Boundary near Leland Avenue 12Encina Avenue Reconstruction Retaining wall structure, down drain, VBR, and fence - Jan 2023Higgins Canyon Road Bridge at Mills Creek Embankment and Wingwall Repairs Project Vicinity MapRoad Oil Application In Conjunction with the County 2022 Chip Seal Road Maintenance Project Location MapCoyote Point Marina Maintenance Dredging and Pile Replacement Project Pavement Repair Work, in the Broadmoor Village (Daly City) Area 82022 Pavement Preservation Project Culvert OutletLobitos Creek Slipout and Culvert Repair September 2022 - Cayon Road RCP Replacement 2Roads Culvert Improvements Project for Various Locations (JOC) Culvert Installation 1Culvert Replacement Project at Bear Gulch September 2022 - New HDPE Culvert with Rock DissipationSawyer Camp Trail Paving and Culvert Improvement Project Repaired bank with erosion control at bridge (post-construction)Scour Countermeasure At Cloverdale Road Bridge Hillside/Adeline Area Sanitary Sewer Rehabilitation Project mapHillside/Adeline Area Sanitary Sewer Rehabilitation Project Bridge Being Installed - Looking EastMirada Road Pedestrian Bridge Replacement – Miramar Area Upper parking lot area2022 Coyote Point Eastern Promenade Rejuvenation Project Azalea FlatParkwide Paving for Memorial Park Accessible Parking (Phase 2) Vicinity_Map West MenloReconstruction of Camino al Lago, Perry Avenue and Palo Alto Way in the West Menlo Park Area Project Sign Pole, Push Button Assembly, and Rectangular Rapid Flashing Beacon Unit DetailBunker Hill Drive and Avenue Alhambra Safe Routes to Schools Pedestrian Improvements Project Location Map Pillar PointPillar Point Harbor CCTV Project Department of Public Works LogoCalifornia Environmental Quality Act (CEQA) Postings Aerial view of plots.CSA 11 Water Supply & Sustainability Project: Storage Tank and Well Proposed_Gauges_3.jpgCounty Flood Warning System Upgrade and Installation CSM Cover_Front_May2023.jpgCounty of San Mateo Routine Maintenance Program Belmont Creek Belmont Creek Watershed Management Plan Navigable Slough Feasibility StudyNavigable Slough Feasibility Study Reconstruction of Loyola AvenueReconstruction of Loyola Avenue from El Camino Real to Glendale Avenue ZLM_Location-Map.jpgReconstruction and Cape Seal of Madrid Ave, Sevilla Ave & Sonora Ave in El Granada 2nd Avenue - AfterReconstruction of A Street and 2nd Ave in Unincorporated Colma Close-up of a mudslideSeneca Lane Mudslide Sewer Stabilization Project Croner Rendered Improvements.jpgReconstruction of Croner Avenue in the West Menlo Park Area Alpine Slip-out 2021 Alpine Slip-out Repair Project Alpine Road Trail Improvements ProjectAlpine Road Trail Improvements Project Madera Lane Bridge_0.jpgMadera Lane Bridge Preventive Maintenance Project Alpine Road Bridge_0.jpgAlpine Road Bridge Preventive Maintenance Project Stage Road Bridge.jpgStage Road Bridge Preventive Maintenance Project Resurfacing 1.jpg2017 Resurfacing of Various Streets 7th-Ave-1.jpgReconstruction of Seventh Avenue in the North Fair Oaks Area HMB Before_Fence2.jpgHalf Moon Bay Airport South Perimeter Installation Project HMB Before_Windsock.jpgHalf Moon Bay Airport Windsock Replacement Project HMB culvert repair_0.jpgHalf Moon Bay Airport Culvert Repair Project Roped off construction area of a crumbling road2016 Winter Storm Damage Repairs dam bridgeCrystal Springs Dam Bridge Replacement Project lucky_and_liberty.jpgReconstruction of Lucky Ave & Liberty Park Ave, Menlo Park Reconstruction of Palo Alto Way, Leland Ave & Stanford Ave1Reconstruction of Palo Alto Way, Leland Ave & Stanford Ave FULL LOGO FINAL_color.pngSeal Cove/Moss Beach Area Roads Improvement Department of Public Works LogoAlpine Road Traffic Corridor Study Eucalyptus Tree Removal El Granada Eucalyptus Tree Removal Project