All Projects

Project No. OD 516; Project File No. E5061

Location

Coyote Point Marina

About the Project

The work to be done consists, in general, of maintenance dredging in the Coyote Point Marina Approach Channel and Entrance Channel, optional additive work may include maintenance dredging of parts of the marina fairways and berths as well as the furnishing and installation of both a concrete navigation pile and a steel guide pile.

Public Works Contact

Zack Azzari
Senior Engineer 
zazzari@smcgov.org
650-363-4100

Contractor

The Dutra Group

UPDATES
  • May 3, 2022 – Project awarded to The Dutra Group for a NTE amount of $2,299,770
  • June 2022 – County executed contract with The Dutra Group. Construction is anticipated to begin in July 2022
  • July 2022 – Construction Started
  • November 2022 – Dredging Completed. Additional and Extra work is requested and will be scheduled, soon.
Location Map Location Map Vicinity Map Vicinity Map