
Overview
Start Date: July 17, 2017
End Date: November 16, 2017
Project Description
Repair of Madera Lane Bridge over El Corte De Madera Creek.
The bridge driving surface will be treated with a polyester concrete overlay, exterior girders to be replaced, patch spalled concrete, repave the roadway approaches and replace bridge and approach railings.
Traffic Advisory
Traffic delays are anticipated near Madera Lane in San Gregorio.
Location
Madera Lane Bridge over El Corte De Madera Creek – near San Gregorio Road
Contractor
TBD
Public Works Contact
Zack Azzari – Senior Civil Engineer
zazzari@smcgov.org