Overview

Start Date: July 15, 2017
End Date:  August 15, 2017

Project Description

The existing 2,300 feet of perimeter fencing on the south-end of the Half Moon Bay Airport is in poor condition. Airports must be fenced in order to meet Federal Aviation Administration requirements.
The perimeter fence will be replaced using material that is resistant to corrosion.
The south perimeter fence project is being paid for with Federal Aviation Administration grant funding (90%) and Airport Enterprise Funds (10%).


Location

Half Moon Bay Airport, 9850 N. Cabrillo Hwy., Half Moon Bay, CA
94019
 

Contractor

Ranch Fence, Inc.
(209) 966-5914

Public Works Contact

Gretchen Kelly, Airport Manager
gkelly@smcgov.org

HMB Before_Fence2.jpgBefore_Fence1.jpg

Update