Overview
Start Date: November 2015
End Date: Summer 2017
Project Description
The County of San Mateo is constructing facility upgrades at Skylonda Fire Station 58. The upgrades include consolidating the existing office and barracks buildings with one new two-story building connected to an apparatus bay, constructing a new driveway access to Skyline Boulevard, a vehicle storage building, modifying the septic system, and replacing the backup emergency power generator. As an essential services facility, the Skylonda Fire Station shall remain operational at all times.
Location
17290 Skyline Boulevard, Woodside CA
Contractor
T.B. Penick & Sons, Inc.
858-558-1800
Public Works Contact
Theresa Yee, CPC, DBIA, Capital Projects Manager
tyee@smcgov.org
650-363-4100