Project No. P30U1; Project File No. E5064
Location
South Fork at San Pedro Valley Park, Pacifica, CA
About the Project
The San Pedro Valley Walnut Bridge Replacement project replaces the end of life walnut bridge with a new pre fabricated bridge. Included in the project will be the removal of the concrete culvert below. County has retain a structural consultant, Quincy Engineering, to provide us with a feasibility study for replacement options.
Public Works Contact
Carter Choi
Senior Engineer
cchoi@smcgov.org
650-363-4100
Contractor
Quincy Engineering
UPDATES
-
July 2022 – Quincy Engineering to provide proposal for replacement.
-
June 2022 – County staff, parks and Quincy Engineering had a field meeting to determine project scope.
-
December 2022 – Task Order to be given to Consor Engineering (formerly Quincy Engineering)