Installation of Soil Nails - Pinned Mesh System April 2026
Installation of Soil Nails - Shotcrete Wall April 2026
Pinned Mesh System April 2026
Shotcrete Wall April 2026
April 2026 Drill Test
April 2026 Drill Test
April 2026 Soil Nail Installation
April 2026 Soil Nail Installation
April 2026 Spider Excavation Efforts
Project Updates
June 2026
Regrading and paving efforts along the beach access road have been completed. The contractor is currently working to install cable rail fencing adjacent to the shotcrete wall.
Project No. P30T1; Project File No. E4995
Location
Tunitas Beach
About the Project
The Tunitas Creek Beach Slide Repair Project includes slope failure stabilization efforts to address two slope failures that occured along the edge of the access road at Tunitas Creek Beach, which leads down to the beach. Stabilization efforts include the installation of a soil nail pinned mesh system and a shotcrete retaining wall with a cable rail fencing. The project also includes the regrading of the access road to improve drainage, as well as the paving of the access road leading up to the parking lot area.
Public Works Contact
Alex Zhang
Senior Engineer
azhang@smcgov.org
650-363-4100
Contractor
Granite Rock Company