June 2025 - Backfilling
May 2025 - Day 1 of Drilling
May 2025 - Temporary Access Ramp - Looking East
Project Updates
February 2026
Construction completed. The trail is now re-opened to the public.
November 2025
Contractor to finalize construction with the installation of cable railing.
October 2025
Contractor to pave the asphalt concrete trail and install asphalt concrete berm.
Project No. YY008; Project File No. E5098
Location
Coyote Point Recreation Area, near CuriOdyssey
About the Project
Repair the landslide that occurred adjacent to CuriOdyssey.
Public Works Contact
Alex Zhang
Senior Civil Engineer (WOC)
azhang@smcgov.org
(650)363-4100
Contractor
Half Moon Bay Grading & Paving, Inc.