All Projects

Project No. P32P1; Project File No. E5059

Location

Memorial Park, the Redwood flat and water treatment area

About the Project

The project includes installation of two backup generators for existing electrical services at the park.

Public Works Contact

Anthony Lum
Senior Engineer 
alum@smcgov.org
650-363-4100

Contractor

TBD

Documents

Maps Below

UPDATES
  • April 2022 - 100% Draft Plans and Specs completed

  • May 2022 – Project was adopted by the Board on May 3, 2022

  • June 2022 - Bid opening on June 2nd. Contract award to ARAM Electric, Inc. on June 28th

  • July 2022 - Pre-Construction meeting on July 14

  • August 2022 - Tentative Construction Start Date: August 15, 2022. Contractor installed new concrete pads

  • November 2022 - Generators are currently being fabricated and will be shipped in 2023

  • December 2022 - Transfer switches are delivered

  • January 2023 - Electrical inspection for the County meter release scheduled

  • March 2023 - A generator was arrived on 3/31

  • May 2023 - PG&E Constuction and meter installation have been completed on 5/17

  • June 2023 - Winterization. A generator will be shipped on 8/30.

August 2022 - Contractor installing new concrete pads 1

August 2022 - Contractor installing new concrete pads 1

August 2022 - Contractor installing new concrete pads 2

August 2022 - Contractor installing new concrete pads 2

Vicinity MapVicinity Map Location MapLocation Map