Project Overview
The project involves resurfacing the two surface parking lots on either side of the Lathrop House. The main paving work was performed on Saturday, February 20, 2016 and striping was done on Saturday, February 27, 2016. It is expected the project will be complete by paving over the dirt pathways connecting the parking lot to sidewalk on May 13, 2016.
Location
627 Hamilton St., Redwood City, CA 94063
Status
Status
Contractor
Contractor
Contact
Contact
Update