Hillside Boulevard Complete Streets Study - Location Map.png

Location Map

Hillside Boulevard Complete Streets Study - Existing Conditions

Existing Conditions

Project Updates

September 2026

Phase 1 engagement has been completed. Phase 2 is expected to begin in early 2027. Follow the study website to be notified of updates: https://fp.mysocialpinpoint.com/hillside-boulevard-complete-streets-study

Previous Updates


Project No. RW623; Project File No. E5128

Location

Hillside Boulevard in Daly City, from E Market Street to Hoffman Street

About the Project

 The Hillside Boulevard Complete Streets Study is aimed at addressing current transportation and wayfinding concerns on a ½ mile stretch of Hillside Boulevard between East Market Street and Hoffman Street in Daly City and the unincorporated Colma area of San Mateo County. It will improve safety, pedestrian crossings, multimodal access (including to bike lanes and public transit), and community connectivity, as well as wayfinding along B-Street to key transit stops.

This Study is being co-led by the County of San Mateo and the City of Daly City and is made possible by local transportation sales tax dollars from the San Mateo County Transportation Authority (SMCTA).

Public Works Contact

Mike Clement
Associate Engineer
mclement@smcgov.org
(650) 363-4100

Contractor

TBA