Project Updates
September 2026
Initial construction is anticipated to begin in September 2026 and will be completed by mid-October 2026. The remainder of the project will be constructed beginning Summber 2027.
Project No. 13311; Project File No. E5103
Location
Entrada Way Bridge at La Honda Creek
About the Project
The repair projects consists of repairing the failed culvert and slope adjacent to the Entrada Way bridge. Drainage improvements include replacing the failed 30" culvert down-drain. Potential repairs include a retaining wall, creek restoration or realignment, and erosion control measures.
Public Works Contact
Wency Ng
Senior Engineer
wng@smcgov.org
(650) 363-4100
Contractor
TBD