Entrada Way - Culvert

Project Updates

September 2026

Initial construction is anticipated to begin in September 2026 and will be completed by mid-October 2026. The remainder of the project will be constructed beginning Summber 2027.

Previous Updates


Project No. 13311; Project File No. E5103

Location

Entrada Way Bridge at La Honda Creek

About the Project

The repair projects consists of repairing the failed culvert and slope adjacent to the Entrada Way bridge. Drainage improvements include replacing the failed 30" culvert down-drain. Potential repairs include a retaining wall, creek restoration or realignment, and erosion control measures. 

Public Works Contact

Wency Ng
Senior Engineer
wng@smcgov.org
(650) 363-4100

Contractor

TBD