The project consists of, to the extent as the total available funding allows, seismic retrofit and an aeration system for the treated water storage tank, replacing the raw water tank, development of a possible new well, and the water distribution system replacement. These elements were identified in the recently completed feasibility study report for the water system.

Location

Address

Status

The preliminary design of the seismic retrofit and an aeration system for the treated water storage tank have been developed and construction is anticipated to completed in 2016. Other elements of the project are planned for 2017/2018.