The work to be done consists, in general, of constructing a new storage tank and well. For the storage tank the work will include constructing ring wall foundations, outlet piping and tank base material, a steel storage reservoir, and gravel access road around new and existing steel tanks. For the well, the work will include constructing the well, installing the well pump and motor, casing, screen, bottom cap, vent pipe, concrete pad, concrete pedestal, discharge piping with all valves and appurtenances, and pump to waste line with all appurtenances and pad. Work will also include furnishing and installation of new electric power, control conduit, wire, instrumentation equipment, as well as any other items and details not mentioned above, but required by the Project Plans, Standard Specifications, Special Provisions, and as directed by the Engineer.